A11262 | Planning
时间限制1s
内存限制256MB
通过 / 提交0/0
题目描述
Helen works in Metropolis airport. She is responsible for creating a departure schedule. There are $n$ flights that must depart today, the $i$ -th of them is planned to depart at the $i$ -th minute of the day.
Metropolis airport is the main transport hub of Metropolia, so it is difficult to keep the schedule intact. This is exactly the case today: because of technical issues, no flights were able to depart during the first $k$ minutes of the day, so now the new departure schedule must be created.
All $n$ scheduled flights must now depart at different minutes between $(k+1)$ -th and $(k+n)$ -th, inclusive. However, it's not mandatory for the flights to depart in the same order they were initially scheduled to do so — their order in the new schedule can be different. There is only one restriction: no flight is allowed to depart earlier than it was supposed to depart in the initial schedule.
Helen knows that each minute of delay of the $i$ -th flight costs airport $c_{i}$ burles. Help her find the order for flights to depart in the new schedule that minimizes the total cost for the airport.
Metropolis airport is the main transport hub of Metropolia, so it is difficult to keep the schedule intact. This is exactly the case today: because of technical issues, no flights were able to depart during the first $k$ minutes of the day, so now the new departure schedule must be created.
All $n$ scheduled flights must now depart at different minutes between $(k+1)$ -th and $(k+n)$ -th, inclusive. However, it's not mandatory for the flights to depart in the same order they were initially scheduled to do so — their order in the new schedule can be different. There is only one restriction: no flight is allowed to depart earlier than it was supposed to depart in the initial schedule.
Helen knows that each minute of delay of the $i$ -th flight costs airport $c_{i}$ burles. Help her find the order for flights to depart in the new schedule that minimizes the total cost for the airport.
输入格式
The first line contains two integers $n$ and $k$ ( $1<=k<=n<=300000$ ), here $n$ is the number of flights, and $k$ is the number of minutes in the beginning of the day that the flights did not depart.
The second line contains $n$ integers $c_{1},c_{2},...,c_{n}$ ( $1<=c_{i}<=10^{7}$ ), here $c_{i}$ is the cost of delaying the $i$ -th flight for one minute.
The second line contains $n$ integers $c_{1},c_{2},...,c_{n}$ ( $1<=c_{i}<=10^{7}$ ), here $c_{i}$ is the cost of delaying the $i$ -th flight for one minute.
输出格式
The first line must contain the minimum possible total cost of delaying the flights.
The second line must contain $n$ different integers $t_{1},t_{2},...,t_{n}$ ( $k+1<=t_{i}<=k+n$ ), here $t_{i}$ is the minute when the $i$ -th flight must depart. If there are several optimal schedules, print any of them.
The second line must contain $n$ different integers $t_{1},t_{2},...,t_{n}$ ( $k+1<=t_{i}<=k+n$ ), here $t_{i}$ is the minute when the $i$ -th flight must depart. If there are several optimal schedules, print any of them.
输入输出样例
输入 #1
5 2 4 2 1 10 2
输出 #1
20 3 6 7 4 5
Let us consider sample test. If Helen just moves all flights $2$ minutes later preserving the order, the total cost of delaying the flights would be $(3-1)·4+(4-2)·2+(5-3)·1+(6-4)·10+(7-5)·2=38$ burles.
However, the better schedule is shown in the sample answer, its cost is $(3-1)·4+(6-2)·2+(7-3)·1+(4-4)·10+(5-5)·2=20$ burles.
However, the better schedule is shown in the sample answer, its cost is $(3-1)·4+(6-2)·2+(7-3)·1+(4-4)·10+(5-5)·2=20$ burles.
C++ 编辑器
输入
输出
可保存默认模板;新题优先使用已保存模板。
当前快捷键仅展示,暂不支持修改。
- 撤销
Ctrl / ⌘ + Z - 重做
Ctrl / ⌘ + Y - 查找
Ctrl / ⌘ + F - 全选
Ctrl / ⌘ + A - 复制
Ctrl / ⌘ + C - 剪切
Ctrl / ⌘ + X - 粘贴
Ctrl / ⌘ + V - 自动排版
工具栏排版按钮 - 草稿保存
编辑时自动保存到本机
历史
提交记录
状态说明时间源码
AI
作答助手
你好,我是作答助手。可以问思路、复杂度、样例含义或代码报错原因;不会直接给出完整 AC 代码。
确定要清空代码吗?
提交通过
评测结果:Accepted